Business

 

 

 

S. E. RAILWAY WORKSHOP, KHARAGPUR

 

Committed to the progress of nation...

 

NEWS & EVENTS

SER displays state-of-the- art pantry car

pantry car

More...

 

Sri A. K. Verma, General Manager/SER's visit to Workshop on 27.02.2013

GM's Visit

More...

Annual Sports at SERSA stadium on 9.3.2013

Sports1
More...

 

Independence Day Celebration at Kharagpur Workshop on 15.08.2013

More...

 

 

Hindi Pakhwada Celebration atSupervisors' Training Centre, Kharagpur on 21.09.2013

More...

 

LATEST UPDATES

Notification for selection of Instructors -

Page 1 Page 2 Page 3 Page 4 Page 5

Syllabus for the selection of Instructor

Model Question Papers for the selection of Instructors

 

Model Question paper for compassionate appointment of Jr. Engineer

 

Model Question paper for compassionate appointment of Group C

 

Status of Employee Assistance Compassionate Ground Cases

 

Recruitment against sports quota for the year 2013-14

 
 
 
 
 

 

About the Workshop

 

Kharagpur Workshop was established in 1898 as a small repair workshop of Bengal Nagpur Railway. Kharagpur Workshop has evolved and grown over the years to become the largest maintenance workshop of the Indian Railways. It has the unique distinction of being the only Workshop of the Indian Railways which deals with all types of Rolling Stock viz. Coaches, EMUs, MEMUs, DEMUs, SP-ART, SP-ARME, Tower Cars, Diesel Locomotives, Electric Locomotives, Diesel Cranes and Wagons.

 

admin Workshop
Administrative Building
Electric Locomotive after Periodic Over Hauling

 

The Workshop also undertakes manufacture of a large number of Rolling Stock components and spares.  Apart from this, Diesel POH Shop has the facilities for re-winding of traction machines, including coil manufacturing.  The Supervisors Training Centre attached to this Workshop has been provided with a Simulator for training of Diesel Locomotive Drivers.

 

Based on the strength of its past achievements and glorious heritage, the Workshop has geared itself for facing the economic and technical challenges of the new millennium.

 

Workshop at a Glance

 

1
Employees
 
a) Gazetted 49
b) Non-gazetted (including Wagon Shop) 8900
2 Area of Workshop 150.73 Acres
3 Total covered Workshop area 2.8 Lakhs sq m.
4 Total rail track length within Workhop 91.63 Kilometres
5 Total road length inside Workshop 22 Kilometres
6 M&P installed 1207 (Including of WRS)
7 Average requirement of Elec. Power   4.71 MWH per month.
8 Availability of standby power 3 DG Sets  of 1750 KW each.
9 Water Consumption 4.2 Lakhs Gallons per day
10 Total staff provided with housing

4810

11 Budget

Rs. 591.63 Crores (approx.) (Debit)

Rs. 584.68 Crores (approx.) (Credit)

Read More

History Milestones

Milestones in the History of Kharagpur Workshop

 

  • 1898: Workshop Established
  • 1903: POH of Steam Locomotives started
  • 1917: POH of Wagons started.
  • 1963:  POH of Diesel Locomotives started.
  • 1985:  POH of Electric Locomotives started.
  • 2004:  Accredited with  ISO 9001-2000 certificate.
  • 2008: Re- certification of ISO 9001 -2000

 

Management

Management Team

 

Sri Sitaram Sinku, CWM(Main Workshop)

Sri Y. B. Shahare, CWM(Wagon)

Sri T. Ramaswamy,Dy.CME(Coordination)

Sri Amit Sinha, Dy.CME(Carriage)

Sri Sanjay Tyagi, Dy.CME (Production)

Sri M. Kulavi, Dy.CEE(ERS-POH)

Sri N. K. Samal, Dy.CME(DMU)

Sri K. P. Adhikari, Dy.CEE(Workshop)

Sri S. P. Singharoy, Dy.CME(Diesel)

Sri T. K. Mondal, Dy.CME(Wagon)

Sri M Murmu, (Principal/STC)

Sri V K Singh, Dy. CMM(Workshop)

Sri M. S. S. Rao, WPO

Sri D. B. Rao, Sr. AFA(Co-ordination)

Sri M M Majhi, CMT

Sri S. K. Mondal, WM(M&P)

Sri S. K. Ghosh, Divisional Engineer

 

Postal Address

Chief Works Manager,

South Eastern Railway Workshop,

Kharagpur, Paschim Medinipur-721301

Phone: 03222-255355 (BSNL), 63100(Rly)

Fax : 03222- 255642(BSNL), 63104(Rly)

Mobile: 9002081402

E-mail: cwmkgpw@yahoo.co.in

 

Outturn

OUT TURN

Coaches & EMU / MEMUs 

Year

AC

NON AC

EMU & MEMU

Total outturn

Target

Actual

Target

Actual

Target

Actual

2009-10

264

264

1572

1445

264

264

1973

2010-11

300

258

1344

1329

264

250

1830

2011-12

300

268

1416

1413

284

243

1924

2012-13

288

270

1380

1400

294

281

1951

2013-14
(upto Mar '14)

264

277

1380

1368

294

322

1982*

Read More

Quality

Quality Policy

To exceed the quality and delivery requirements of our customer with respect to overhauling of coaches including EMU Motor and Trailer coaches, Wagons, Diesel and Electric Locomotives and their accessories and to continually improve our quality management system.

Quality Objective

To ensure customer satisfaction as reflected through improvement in post-overhaul reliability.

 

Reduce finished material rejection by continual development of equipment, inspection, process control and competence among all staff and employees.

 

Continual development of product as per customer predicted need and delight to customers through innovation.

 

To achieve the quality targets established for each unit of Kharagpur Workshop.

potential

Overhauling, Reconditioning

AC/Non-AC, EMU Motor/Trailer coaches.

All types of vacuum brake/air brake 4Wheeler/8Wheeler wagons.

Diesel Locomotives.

Electric Locomotives.

Steam and Diesel Cranes.

Weighbridges.

Wheel & axles of Railway vehicles.

Distribution transformers, pumps, industrial motors, DG sets, alternators and welding plants.

Machinery & Plants and road vehicles

Read More

   
 

Last updated on April 9, 2014
Developed and Powered By Uday Kumar Mishra, I T Centre, Kharagpur Workshop, S. E. Railway. 
Send mail to
admin@kharagpurworkshop.org with questions or comments about this web site.
Copying the contents of this site without permission may invite legal action against the offender.

vcount
Free Hit Counters